Terminal 91 Berth 6 and 8 Redevelopment
The Terminal 91 Berth 6 Redevelopment project is a major infrastructure initiative aimed at enhancing the capacity, safety, and operational efficiency of...Learn More
Berth Two Beyond Carbon
Trigon is a long-standing mainstay of the economy in northern British Columbia and its Berth Two Beyond Carbon facility nearly doubles terminal...Learn More
Pier 58 / Seattle Waterfront
Project consisted of the installation of in-water piling, precast pile caps, precast prestressed deck panels, cast-in-place concrete, cast-in-place concrete topping slab with architectural...Learn More
Antarctica – Palmer Station Pier
PPM is proud to have played a key role in the construction of the Antarctica Pier at Palmer Station, a vital infrastructure...Learn More
Dry Docks Removal
The Lake Washington Dry Docks Removal Project, was a crucial undertaking to restore the natural environment and enhance the safety and accessibility...Learn More
Petroleum and Cement Terminal Construction
The Port of Alaska Petroleum and Cement Terminal project is a state-of-the-art facility designed to enhance the region’s fuel and cement distribution...Learn More
Cellular Cofferdam – Hebgen Dam
PPM was responsible for building a temporary coffer dam to allow repairs to the existing Hebgen Dam. This involved dewatering around the...Learn More
Marina Dredging – Flounder Bay
Pacific Pile & Marine restored the marina to prior dredged elevations. The project included navigation pile removal and reinstallation. Work consisted of...Learn More
Airport Runway Improvements – Sitka, Alaska
The primary goal of this project is to enhance the safety and operational efficiency of the Sitka Airport, ensuring the airport meets...Learn More
Chief Joseph Dam Fish Hatchery
The Chief Joseph Dam Fish Hatchery was a vital infrastructure initiative aimed at enhancing fish populations and restoring the ecological balance of...Learn More