Pier 58 / Seattle Waterfront
The foundation for the new Pier 58 is taking shape along the Seattle waterfront. The project is a piece of the $756... Learn More
Pier 63 Waterfront Demolition
For the last several months, crews and equipment operators have been working to permanently remove the pier. To accomplish this goal, approximately... Learn More
Antarctica – Pier at Palmer Station
Construction of the new pier at Palmer Station was completed at the end of April, the first major milestone in modernizing the... Learn More
Lake Washington Dry Docks Removal
Deconstruction of two derelict sunken dry docks in 25-ft of water went beyond the normal vessel salvage. The dry docks had been... Learn More
Vessel Salvage – John Wayne Marina
Emergency response was called for a boat salvage to recover the vessel that had exploded while moored in the marina. A local... Learn More
Petroleum and Cement Terminal Construction
Pacific Pile and Marine started building the Petroleum and Cement Terminal (PCT) trestle and deck in late April. The PCT will be... Learn More
Hebgen Dam – Cellular Cofferdam
Design-build emergency deep intake structure to stabilize failed intake structure in the environmentally sensitive headwaters of the Madison River at the Hebgen... Learn More
Maplewood Marine Restoration Project
Habitat in the Northeast Basin was created by beneficially using approximately 87,000 m3 of dredge material from the Southern Intertidal Area (resulting... Learn More
White Rock Pier Reconstruction
WHITE ROCK, B.C. – Canada’s longest pier in White Rock, B.C. is once again complete after being partially destroyed by a storm... Learn More
Shoreline Restoration – Fort Townsend State Park
Shoreline restoration providing easier access to a beach at Fort Townsend and habitat for shorebirds, forage fish and other marine animals is... Learn More