Petroleum & Cement Terminal Access Trestle

Client Port of Alaska
Location Anchorage, AK
Scope Of Work Construct Access Trestle
Schedule 8-2019 to 12-2020

Project Detail

Construction of Petroleum and Cement Terminal Access Trestle supported by (22) 48- in steel pipe pile up to 185-ft in length and (4) 48-in indicator pile, structural pile caps, decking with dowel system for future cast-in-place curb, abutment, and approach slab; and Loading Platform supported by (42) 48-in steel pipe pile up to 176-ft, (3) 48-in indicator pile, structural pile caps, temporary bracing, and decking with dowel system for future cast-in-place curb. Pipe pile installed in 3 segments up to 117-ft for Loading Platform and 106- ft for Access Trestle. Temporary work trestle installed involving (24) 36-in and (36) 24-in pile driven with an APE 400 vibratory hammer. Permanent pile installed with D-180 impact hammer. Heavy equipment includes the Pacific Lifter, a 1,000 ton lift capacity derrick barge with American 509 Revolver, 550 ton Demag CC2500 crawler crane, and American 9310 crawler crane. Work performed in coordination with independent, 3rd party marine mammal observers.