Projects Archive

  • Work Performed

    Complete dock structure with crane rail supported on 88 driven and socketed piles. The replacement project is directly adjacent to […]


    • Location: Kodiak, AK
    • Contract: < $3M
    • Dates: Apr-2014 - Feb-2016
    • Contact: Lon White

    Full Description

    Kodiak Pier 3 Replacement

    Kodiak, AK

  • Work Performed

    The Seattle waterfront is home to a number of iconic landmarks including the Ivar’s, Inc. seafood restaurant at Pier 54. […]


    • Location: Seattle, WA
    • Contract: $5-10M
    • Dates: Jun-2014 - Mar-2015
    • Contact: Joy Okazaki

    Full Description

    Pier 54 Piling and Apron Replacement

    Seattle, WA

  • Work Performed

    Demolition and removal of the existing timber Tank Farm pier and dredging of a 500-ft wide navigation channel for upland […]


    • Location: Mukilteo, WA
    • Contract: < $3M
    • Dates: Jun-2015 - Feb-2016
    • Contact: John Callahan

    Full Description

    Mukilteo Ferry Terminal Phase 1 Tank Farm Demolition and Dredging

    Mukilteo, WA

  • Work Performed

    The West Approach Bridge North (WABN) Project was a construction phase of the SR 520 Bridge Replacement and HOV Program for […]


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Dec-2014 - Apr-2017
    • Client: Flatiron Construction Corp.
    • Contact: Paul Mayo

    Full Description

    SR 520 Montlake to Evergreen Pt. Bridge West Approach Bridge North

    Seattle, WA

  • Work Performed

    Nearly half of the American population lives within 50 miles of coastlines. In 2014, the U.S. Department of Energy (DOE) […]


    • Location: Reedsport, OR
    • Contract: < $3M
    • Dates: Jul-2012 - Oct-2012
    • Client: Northwest Underwater Construction, LLC
    • Contact: Jesse Hutton

    Full Description

    Unit #1 Mooring and Buoy Installation

    Reedsport, OR

  • Work Performed

    The Christy Lee Platform, located along the western shore of Cook Inlet near the Drift River Terminal Facility, experienced catastrophic mechanical […]


    • Location: Cook Inlet, AK
    • Contract: < $3M
    • Dates: Mar-2012 - Oct-2012
    • Client: Global Diving & Salvage, Inc.
    • Contact: John Juettner

    Full Description

    Christy Lee Fender Salvage & Reinstallation

    Cook Inlet, AK

  • Work Performed

    Emergency boat salvage to recover a boat that exploded while moored in the marina. A Sequim man was installing a new […]


    • Location: Sequim, WA
    • Contract: < $3M
    • Dates: Feb-2012 - Feb-2012
    • Client: Ballard Diving & Salvage
    • Contact: Michael Eakin

    Full Description

    Emergency Boat Salvage

    Sequim, WA

  • Work Performed

    Dredging of 29,000 cubic yards of sediments in the Port’s Marina in the vicinity of the North Visitor’s Float, Fuel […]


    • Contract: < $3M
    • Dates: Nov-2011 - Apr-2012
    • Client: Port of Everett
    • Contact: John Klekotka

    Full Description

    Marina Maintenance Dredging Phase 1

    WA

  • Work Performed

    The Timber Pile Removal and Replacement project involved the removal and replacement of timber at the Kingston Marina. 56 pile were removed […]


    • Location: Kingston, WA
    • Contract: < $3M
    • Dates: Dec-2011 - Feb-2012
    • Client: Port of Kingston
    • Contact: Bruce MacIntyre

    Full Description

    Timber Pile Removal and Replacement

    Kingston, WA

  • Work Performed

    Remove existing structure and furnish and install 54-in diameter steel pipe pile utilizing bubble curtain system.


    • Location: Mount Vernon, WA
    • Contract: $205,000
    • Dates: Nov-2011 - Dec-2011
    • Client: WA Dept. of Transportation
    • Contact: Mark Hammer

    Full Description

    SR536 Skagit River Bridge Dolphin Replacement

    Mount Vernon, WA

  • Work Performed

    Emergency repair of a portion of the Skagit River Bridge that collapsed near Mount Vernon after a semi-truck struck critical steel […]


    • Location: Mount Vernon, WA
    • Contract: $1,800,000
    • Dates: May-2013 - Aug-2013
    • Client: Guy F. Atkinson
    • Contact: Al Gonzales

    Full Description

    I-5 Skagit Bridge Collapse

    Mount Vernon, WA

  • Work Performed

    Salvaged a submerged houseboat submerged near Port Orchard’s Railroad Marina. Multiple holes punctured one of the pontoons that floats the vessel […]


    • Location: Port Orchard, WA
    • Dates: Dec-2010 - Dec-2010
    • Client: Northwest Underwater Construction
    • Contact: Michael Eakin

    Full Description

    Port Orchard Boat Recovery

    Port Orchard, WA

  • Work Performed


    • Location: Cougar, WA
    • Contract: $9,587,000
    • Dates: Oct-2010 - Sep-2012
    • Client: Natt McDougall Company
    • Contact: Dan Phelan

    Full Description

    Lewis River Fish Passage Swift Downstream Collection Project

    Cougar, WA

  • Work Performed

    Sitka has a runway created largely by filling in between small islands facing the Gulf of Alaska. The runway is […]


    • Location: Sitka, AK
    • Contract: < $3M
    • Dates: Dec-2010 - Feb-2013
    • Client: Alaska Department of Transportation
    • Contact: Todd Fleming

    Full Description

    Sitka-Rocky Gutierrez Airport Runway Safety Area Improvements

    Sitka, AK

  • Floating Breakwater

    Work Performed

    Contracted to furnish and install floating breakwaters to complete the Carl E. Moses Harbor in Unalaska. Included two concrete floating […]


    • Location: Dutch Harbor, AK
    • Contract: $12,500,000
    • Dates: Sep-2010 - Nov-2011
    • Client: US Army Corps of Engineers

    Full Description

    Carl E Moses Floating Breakwater

    Dutch Harbor, AK

  • Work Performed

    Constructed 100-ft x 60-ft steel pile-supported concrete dock. Dock was extended by mooring piles on either side, giving the facility […]


    • Location: Old Harbor, AK
    • Contract: $6,300,000
    • Dates: Apr-2011 - Aug-2011
    • Client: City of Old Harbor

    Full Description

    Old Harbor City Dock

    Old Harbor, AK

  • Work Performed

    Marine berth for 265-ft, 26,000-ton offshore drilling vessel Kulluk. Berth consisted of four offshore breasting dolphins using 48-in dia. pile […]


    • Location: Dutch Harbor, AK
    • Dates: Oct-2010 - Dec-2010
    • Client: Offshore Systems Inc.
    • Contact: Joey Willis

    Full Description

    Shell Mooring Facility

    Dutch Harbor, AK

  • Work Performed

    Demolition and removal of more than 2,500 creosote-treated piling and three timber docks at Classified Superfund site. Load and transport […]


    • Location: Tacoma, WA
    • Contract: $2,300,000
    • Dates: Sep-2010 - Feb-2011
    • Client: Dept. of Natural Resources
    • Contact: Tim Goodman

    Full Description

    Asarco Pier & Piling Removal

    Tacoma, WA

Request Services