Pacific Pile & Marine restored the marina to prior dredged elevations. The project included navigation pile removal and reinstallation. Work consisted of channel dredging, accurately placing sediment as eel grass bedding, dredging around City of Anacortes Outfall that had contamination potential, upland disposal, dredging in tight spaces (slips and fairways) in an active marina, slope dredging and open water disposal. Limited access required close proximity precision dredging.
