  • Avery Landing Cleanup

    Work Performed

    Involved removing and disposing 43,000 cy of contaminated soil. Soil had been contaminated through diesel, bunker oils, and spoils from […]


    • Location: Avery, ID
    • Contract: $5-10M
    • Dates: Mar-2013 - Sep-2013
    • Contact: Terry Cundy

    Full Description

    Avery Landing Cleanup

    Avery, ID

  • Fremont Siphon

    Work Performed

    Secant excavation for the North and South secant shafts.


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Jul-2015 - Dec-2015
    • Client: Stellar J Corporation
    • Contact: Jeff Walker

    Full Description

    Fremont Siphon Replacement and Odor Control Facility

    Seattle, WA

  • Bellingham Terminal

    Work Performed

    Project included demolition of existing structures at the North and Central Terminal including excavation of approximately 4,275 cy clean material […]


    • Location: Bellingham, WA
    • Contract: $3,599,000
    • Dates: Sep-2012 - Jul-2013
    • Contact: Susan French

    Full Description

    Terminal Bulkhead and Pier Repair

    Bellingham, WA

  • MFT Demo

    Work Performed

    Demolition and removal of the existing timber Tank Farm pier and dredging of a 500-ft wide navigation channel for upland […]


    • Location: Mukilteo, WA
    • Contract: $8,491,000
    • Dates: Jun-2015 - Feb-2016
    • Contact: John Callahan

    Full Description

    Mukilteo Ferry Terminal Phase 1 Tank Farm Demolition and Dredging

    Mukilteo, WA

  • Emergency Boat Salvage

    Work Performed

    Emergency boat salvage to recover a boat that exploded while moored in the marina. A Sequim man was installing a new […]


    • Location: Sequim, WA
    • Contract: $45,000
    • Dates: Feb-2012 - Feb-2012
    • Client: Ballard Diving & Salvage
    • Contact: Michael Eakin

    Full Description

    Emergency Boat Salvage

    Sequim, WA

  • Everett Marina Dredging

    Work Performed

    Dredging of 29,000 cubic yards of sediments in the Port’s Marina in the vicinity of the North Visitor’s Float, Fuel […]


    • Contract: $888,560
    • Dates: Nov-2011 - Apr-2012
    • Client: Port of Everett
    • Contact: John Klekotka

    Full Description

    Marina Maintenance Dredging Phase 1

    WA

  • Asarco Pier and Piling

    Work Performed

    Demolition and removal of more than 2,500 creosote-treated piling and three timber docks at Classified Superfund site. Load and transport […]


    • Location: Tacoma, WA
    • Contract: $2,300,000
    • Dates: Sep-2010 - Feb-2011
    • Client: Dept. of Natural Resources
    • Contact: Tim Goodman

    Full Description

    Asarco Pier & Piling Removal

    Tacoma, WA

  • Hebgen_1

    Work Performed

    Hebgen Dam, located near West Yellowstone, Mt, stands at over 6,500-ft in elevation tucked among the mountains. The nearest city of any […]


    • Location: West Yellowstone, MT
    • Contract: $10,400,000
    • Dates: May-2009 - May-2010
    • Client: PPL Montana, LLC
    • Contact: Carrie Harris

    Full Description

    Hebgen Cellular Cofferdam

    West Yellowstone, MT

  • DCI_1

    Work Performed

    Major redevelopment and expansion of the DCI Shipyard. Phase I included demolition and removal of 24,000 sq ft of dock […]


    • Location: Anacortes, WA
    • Contract: $14,100,000
    • Dates: May-2008 - Dec-2009
    • Client: Dakota Creek Industries
    • Contact: Mike Nelson

    Full Description

    DCI Shipyard Redevelopment

    Anacortes, WA

  • T115_18

    Work Performed

    Superfund site. Built new barge loading and unloading facility. Involved sheet pile, upland and in-water pile driving, contaminated dredging, demolition […]


    • Location: Seattle, WA
    • Contract: $2,800,000
    • Dates: Dec-2009 - Apr-2010
    • Client: Port of Seattle
    • Contact: Jerry Dowd

    Full Description

    Terminal 115 Berth Modifications

    Seattle, WA

  • MTB_6

    Work Performed

    Maintenance dredged 9,700 cubic yards of contaminated material along the port facility pier. The dredge sediment was then transported by […]


    • Location: Olympia, WA
    • Contract: $1,600,000
    • Dates: Jan-2009 - Mar-2009
    • Client: Port of Olympia
    • Contact: Rick Anderson

    Full Description

    Marine Terminal Berths 2 & 3 Interim Action Dredging

    Olympia, WA

  • Ebey Trestle_1

    Work Performed

    In coordination with Ruskin Construction, PPM was contracted to perform substructure work to the construction of a 4,300-ft pile-supported water […]


    • Location: Everett, WA
    • Contract: $8,500,000
    • Dates: Feb-2008 - Mar-2010
    • Client: Tri-State Construction, Inc
    • Contact: Paul Clements

    Full Description

    Ebey Slough Trestle Installation

    Everett, WA

  • 10th St Marine Park_1

    Work Performed

    Installed 80-ft gangway and floatation billets. Installed gangway concrete abutment and approach slab and handrail.


    • Location: Everett, WA
    • Contract: $119,800
    • Dates: May-2009 - May-2010
    • Client: Grade, Inc
    • Contact: Kreg Oveson

    Full Description

    10th Street Marine Park Shore Projection

    Everett, WA

  • Des Moines Marina

    Work Performed

    Dredged boat ramp area, southern outfall and northern outfall. Removed and offloaded pile. Dredged unsuitable sediments in the entrance channel […]


    • Location: Des Moines, WA
    • Contract: $430,000
    • Dates: Jan-2009 - Jan-2009
    • Client: City of Des Moines
    • Contact: Joe Dusenbury

    Full Description

    Des Moines Marina Maintenance Dredge

    Des Moines, WA

  • Wiley_1

    Work Performed

    Furnished and installed permanent sheet for cut-off wall. Furnished, installed and removed two temporary sheet pile cut-off walls approximately 46 […]


    • Location: Mount Vernon, WA
    • Contract: $160,000
    • Dates: Aug-2008 - Oct-2008
    • Client: Northwest Construction, Inc
    • Contact: Ian Slater

    Full Description

    Wiley Slough Estuary Restoration Phase I

    Mount Vernon, WA

Request Services