Ebey Slough Trestle Installation

Location Marysville, WA
Scope Of Work Trestle Installation
Schedule 2008 -2010

Project Detail

PPM was contracted to perform substructure work in support of construction of a 4,300-ft pile-supported water line bridge.  The 85 year old Ebey Slough Bridge is a four-lane, fixed span steel structure.

the PPM team installed trestle to support work access as well as constructing pipe-line foundation including piling and capping.