  • Work Performed

    Involved removing and disposing 43,000 cy of contaminated soil. Soil had been contaminated through diesel, bunker oils, and spoils from […]


    • Location: Avery, ID
    • Contract: $5-10M
    • Dates: Mar-2013 - Sep-2013
    • Contact: Terry Cundy

    Full Description

    Avery Landing Cleanup

    Avery, ID

  • Work Performed

    Provided a 70-ton crane for the installation and removal of a super sack diversion dam. Using a clam bucket, excavated […]


    • Location: Port Angeles, WA
    • Contract: < $3M
    • Dates: Mar-2013 - Mar-2013
    • Client: Macnak Construction, LLC

    Full Description

    Corrections for Elwha Water Facility

    Port Angeles, WA

  • Work Performed

    Demolition and removing of existing floating docks and utilities and installation of new in kind. Portions of the existing electric […]


    • Location: Hydaburg, AK
    • Contract: < $3M
    • Dates: Jan-2013 - Jun-2013

    Full Description

    Hydaburg Small Boat Harbor Renovation

    Hydaburg, AK

  • Work Performed

    Secant excavation for the North and South secant shafts.


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Jul-2015 - Dec-2015
    • Client: Stellar J Corporation
    • Contact: Jeff Walker

    Full Description

    Fremont Siphon Replacement and Odor Control Facility

    Seattle, WA

  • Work Performed

    Retrofitted 230-ft x 60-ft barge for floating extension to a cruise ship berth. Involved construction of new and retrofitted dolphins, […]


    • Location: Skagway, AK
    • Contract: $3-5M
    • Dates: Sep-2012 - May-2013
    • Contact: Ed Hanousek

    Full Description

    Railroad Dock Floating Dock

    Skagway, AK

  • Work Performed

    Replace timber trestle pile with new pile. Also included replacing the Slip 3 timber overpass walkway, asphalt paving, and other […]


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Aug-2012 - Feb-2013
    • Contact: Barbara Olsen

    Full Description

    SR 519 Seattle Timber Trestle Preservation

    Seattle, WA

  • Work Performed

    The Ammunition Pier Piling Replacement consisted of the demolition, removal and replacement of 24-in dia. hollow and 18-in dia. pre-stressed concrete […]


    • Location: Port Hadlock, WA
    • Contract: < $3M
    • Dates: Sep-2012 - Jan-2013
    • Client: Reyes Construction Inc
    • Contact: Gustavo Anaya

    Full Description

    Ammunition Pier Repair

    Port Hadlock, WA

  • Work Performed

    Installed 321 18-in dia. or 24-in dia. augercast pile. Called for tension and compression load tests. Also installed 165 ea. […]


    • Location: Bellingham, WA
    • Contract: < $3M
    • Dates: Aug-2012 - Oct-2013
    • Client: Strider Construction Co., Inc.
    • Contact: James Gebhardt

    Full Description

    Post Point Waste Water Treatment Facility

    Bellingham, WA

  • Work Performed

    Project included demolition of existing structures at the North and Central Terminal including excavation of approximately 4,275 cy clean material […]


    • Location: Bellingham, WA
    • Contract: < $3M
    • Dates: Sep-2012 - Jul-2013
    • Contact: Susan French

    Full Description

    Terminal Bulkhead and Pier Repair

    Bellingham, WA

  • Work Performed

    Complete dock structure with crane rail supported on 88 driven and socketed piles. The replacement project is directly adjacent to […]


    • Location: Kodiak, AK
    • Contract: < $3M
    • Dates: Apr-2014 - Feb-2016
    • Contact: Lon White

    Full Description

    Kodiak Pier 3 Replacement

    Kodiak, AK

  • Work Performed

    Installation of 14 ea. 24-in dia. x 60-ft depth and 12 ea. 16-in dia. x 55-ft depth reinforced augercast pile.


    • Location: Tacoma, WA
    • Contract: < $3M
    • Dates: Jun-2014 - Jul-2014
    • Client: General Mechanical, Inc.
    • Contact: Stephen Hoover

    Full Description

    Oil Refinery Augercast Pile

    Tacoma, WA

  • Work Performed

    Demolition and removal of the existing ferry terminal including upland excavation and backfill requiring ESPC. Includes concrete deck structure, concrete […]


    • Location: Kodiak, AK
    • Contract: < $3M
    • Dates: Jun-2014 - May-2016
    • Contact: Todd Boris

    Full Description

    Kodiak Ferry Terminal & Dock Improvements

    Kodiak, AK

  • Work Performed

    The Seattle waterfront is home to a number of iconic landmarks including the Ivar’s, Inc. seafood restaurant at Pier 54. […]


    • Location: Seattle, WA
    • Contract: $5-10M
    • Dates: Jun-2014 - Mar-2015
    • Contact: Joy Okazaki

    Full Description

    Pier 54 Piling and Apron Replacement

    Seattle, WA

  • Work Performed

    Demolition and removal of the existing timber Tank Farm pier and dredging of a 500-ft wide navigation channel for upland […]


    • Location: Mukilteo, WA
    • Contract: < $3M
    • Dates: Jun-2015 - Feb-2016
    • Contact: John Callahan

    Full Description

    Mukilteo Ferry Terminal Phase 1 Tank Farm Demolition and Dredging

    Mukilteo, WA

  • Work Performed

    The West Approach Bridge North (WABN) Project was a construction phase of the SR 520 Bridge Replacement and HOV Program for […]


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Dec-2014 - Apr-2017
    • Client: Flatiron Construction Corp.
    • Contact: Paul Mayo

    Full Description

    SR 520 Montlake to Evergreen Pt. Bridge West Approach Bridge North

    Seattle, WA

  • Work Performed

    The Don Morse Memorial Park is located on the shoreline of Lake Chelan, just above the Lake Chelan Dam in the town […]


    • Location: Chelan, WA
    • Contract: < $3M
    • Dates: Apr-2012 - Apr-2013
    • Client: KRCI LLC
    • Contact: Kyle Snitily

    Full Description

    Don Morse Park Phase 1 Improvements

    Chelan, WA

  • Work Performed

    Nearly half of the American population lives within 50 miles of coastlines. In 2014, the U.S. Department of Energy (DOE) […]


    • Location: Reedsport, OR
    • Contract: < $3M
    • Dates: Jul-2012 - Oct-2012
    • Client: Northwest Underwater Construction, LLC
    • Contact: Jesse Hutton

    Full Description

    Unit #1 Mooring and Buoy Installation

    Reedsport, OR

  • Work Performed

    The Christy Lee Platform, located along the western shore of Cook Inlet near the Drift River Terminal Facility, experienced catastrophic mechanical […]


    • Location: Cook Inlet, AK
    • Contract: < $3M
    • Dates: Mar-2012 - Oct-2012
    • Client: Global Diving & Salvage, Inc.
    • Contact: John Juettner

    Full Description

    Christy Lee Fender Salvage & Reinstallation

    Cook Inlet, AK