Projects Archive

  • Work Performed

    Design-build installation and removal of 1.3 mile long pile-supported work trestle, large diameter drilled shaft installation, and marine heavy lift […]


    • Location: Seattle, WA
    • Contract: $10-20M
    • Dates: Jul-2014 - Jul-2018
    • Client: Flatiron West, Inc.

    Full Description

    SR520 W Montlake to Evergreen Point Bridge Approach Bridge North

    Seattle, WA

  • Work Performed

    Removal of four undersized ship-to-shore (STS) container cranes from T18 and T46 in the North Harbor. On-site disassembly was performed […]


    • Location: Seattle, WA
    • Contract: $3-5M
    • Dates: Dec-2018 - Apr-2019
    • Contact: Ralph Graves

    Full Description

    Terminal 18 & 46 Removal of Ship-to-Shore Container Cranes

    Seattle, WA

  • Work Performed

    Demolition and reconstruction of existing timber trestle Pier 62 and a portion of Pier 63, including, utility, roadway, and surface […]


    • Location: Seattle, WA
    • Contract: $20-50M
    • Dates: Nov-2017 - Summer-2019
    • Contact: Nancy Locke

    Full Description

    Pier 62/63 Rebuild Phase 1 – Habitat and Alaskan Way Improvements

    Seattle, WA

  • Work Performed

    Colman Dock is WSF’s largest and busiest ferry terminal supporting transportation across Puget Sound between downtown Seattle and communities in […]


    • Location: Seattle, WA
    • Contract: >$50M
    • Dates: 2017 - 2023

    Full Description

    SR519 Seattle Multimodal Terminal at Colman Dock

    Seattle, WA

  • Work Performed

    Complete dock structure with crane rail supported on 88 driven and socketed piles. The replacement project is directly adjacent to […]


    • Location: Kodiak, AK
    • Contract: < $3M
    • Dates: Apr-2014 - Feb-2016
    • Contact: Lon White

    Full Description

    Kodiak Pier 3 Replacement

    Kodiak, AK

  • Work Performed

    Demolition and removal of the existing ferry terminal including upland excavation and backfill requiring ESPC. Includes concrete deck structure, concrete […]


    • Location: Kodiak, AK
    • Contract: < $3M
    • Dates: Jun-2014 - May-2016
    • Contact: Todd Boris

    Full Description

    Kodiak Ferry Terminal & Dock Improvements

    Kodiak, AK

  • Work Performed

    The Seattle waterfront is home to a number of iconic landmarks including the Ivar’s, Inc. seafood restaurant at Pier 54. […]


    • Location: Seattle, WA
    • Contract: $5-10M
    • Dates: Jun-2014 - Mar-2015
    • Contact: Joy Okazaki

    Full Description

    Pier 54 Piling and Apron Replacement

    Seattle, WA

  • Work Performed

    The West Approach Bridge North (WABN) Project was a construction phase of the SR 520 Bridge Replacement and HOV Program for […]


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Dec-2014 - Apr-2017
    • Client: Flatiron Construction Corp.
    • Contact: Paul Mayo

    Full Description

    SR 520 Montlake to Evergreen Pt. Bridge West Approach Bridge North

    Seattle, WA

  • Work Performed

    The Don Morse Memorial Park is located on the shoreline of Lake Chelan, just above the Lake Chelan Dam in the town […]


    • Location: Chelan, WA
    • Contract: < $3M
    • Dates: Apr-2012 - Apr-2013
    • Client: KRCI LLC
    • Contact: Kyle Snitily

    Full Description

    Don Morse Park Phase 1 Improvements

    Chelan, WA

  • Work Performed


    • Location: Cougar, WA
    • Contract: $9,587,000
    • Dates: Oct-2010 - Sep-2012
    • Client: Natt McDougall Company
    • Contact: Dan Phelan

    Full Description

    Lewis River Fish Passage Swift Downstream Collection Project

    Cougar, WA

  • Work Performed

    Constructed 100-ft x 60-ft steel pile-supported concrete dock. Dock was extended by mooring piles on either side, giving the facility […]


    • Location: Old Harbor, AK
    • Contract: $6,300,000
    • Dates: Apr-2011 - Aug-2011
    • Client: City of Old Harbor

    Full Description

    Old Harbor City Dock

    Old Harbor, AK

  • Work Performed

    S. Holgate to S. King Street. Furnished, spliced and drove 60-in. dia., 36-in. diameter, 20-in. diameter and 16-in. dia. steel […]


    • Location: Seattle, WA
    • Contract: $10,500,000
    • Dates: Apr-2010 - Mar-2012
    • Client: Skanska USA Civil Northwest, Inc.
    • Contact: Tim O'Neill

    Full Description

    SR99 Alaska Way Viaduct Removal

    Seattle, WA

  • Work Performed

    Installation of concrete filled steel piles including rebar cages. Also included soldier pile retaining wall, temporary shoring wall, and associated […]


    • Location: Tacoma, WA
    • Contract: $980,000
    • Dates: Jul-2010 - Sep-2011
    • Client: JE Dunn Construction Company
    • Contact: Greg Jasper

    Full Description

    Tacoma Recovery & Transfer Center

    Tacoma, WA

  • Work Performed

    Replaced existing two-lane steel bridge with four-lane, fixed-span steel bridge for the WA Dept. of Transportation. Installed 48-in and 72-in […]


    • Location: Marysville, WA
    • Contract: $4,125,000
    • Dates: Sep-2010 - Jan-2011
    • Client: Granite Construction Company
    • Contact: Jacob Zacharda

    Full Description

    Ebey Slough Bridge Replacement

    Marysville, WA

  • Work Performed

    Cut off sheets, place rock backfill, and install walkway on top of sheets.


    • Location: Seattle, WA
    • Dates: Sep-2008 - Sep-2008
    • Client: Argosy Cruises
    • Contact: Don Wicklund

    Full Description

    West Seattle Dock Repair

    Seattle, WA

  • Work Performed

    Constructed new 600MT ship haul out facility consisting of steel pipe piles, composite steel, concrete deck girders and concrete abutment. […]


    • Location: Kodiak, AK
    • Contract: $10,400,000
    • Dates: Jul-2008 - Sep-2009
    • Client: City of Kodiak
    • Contact: Lon White

    Full Description

    St. Herman Harbor Boat Lift Facility

    Kodiak, AK