Client City of Hydaburg
Location Hydaburg, AK
Scope Of Work Harbor Renovation
Schedule 1-2013 - 6-2013
Tags Port & Terminal
Project Detail
Demolition and removal of existing floating docks and utilities and installation of new in kind. Portions of the existing electric utilities were salvaged and reused. Pacific Pile & Marine furnished and installed new floating docks, access trestle modifications, new fish cleaning station, and associated potable water, fire suppression, and electrical utilities. Also installed owner-furnished aluminum access gangway and piling. The floating docks included new main floats A and B; breakwater float; and various Tee and finger floats.