Project Detail
PPM was contracted to perform substructure work in support of construction of a 4,300-ft pile-supported water line bridge. The 85 year old Ebey Slough Bridge is a four-lane, fixed span steel structure.
the PPM team installed trestle to support work access as well as constructing pipe-line foundation including piling and capping.