• Carl E Moses Boat Harbor

    Work Performed

    Design-build construction of the Carl E Moses Small Boat Harbor. Involved fabrication and installation of hot-dip galvanized steel floats with […]

    Location: Unalaska, AK
    Contract:
    Dates: Dec-2009 - Nov-2011
    Client: City of Unalaska
    Contact: Nancy Peterson
    Full Description
  • DCI Shipyard Redevelopment

    Work Performed

    Major redevelopment and expansion of the DCI Shipyard. Phase I included demolition and removal of 24,000 SF of dock including […]

    Location: Anacortes, WA
    Contract:
    Dates: May-2008 - Dec-2009
    Client: Dakota Creek Industries
    Contact: Mike Nelson
    Full Description
  • Pine Lake Park Phase II Dock Construction

    Work Performed

    Constructed 16-ft wide float sections with DF decking. Constructed 12-ft wide float sections with thru-flow DF decking. Drove test piles, […]

    Location: Sammamish, WA
    Contract:
    Dates: Feb-2009 - Mar-2009
    Client: Dept. of Parks and Recreation
    Contact: Jack Seipel
    Full Description
  • Seabeck Marina

    Work Performed

    Marina restoration. Replaced the existing dilapidated Seabeck Marina, condemned in 2005, with a 200-slip marina along the downtown Seabeck waterfront. […]

    Location: Seabeck, WA
    Contract:
    Dates: Mar-2010 - Apr-2010
    Client: Olympic View Marina, LLC
    Contact: Boyer Halvorsen
    Full Description
  • Lake WA Dry Dock Removal

    Work Performed

    Deconstruction of two derelict sunken dry docks in 25-ft of water. Dry docks were too sunken to be easily raised. […]

    Location: Renton, WA
    Contract:
    Dates: Jul-2008 - Feb-2009
    Client: Dept. of Natural Resources
    Contact: Melissa Ferris
    Full Description
  • Pier 54-55

    Work Performed

    Dock and foundation repairs. Installed 180 cf  of floatation under the existing moorage adjacent to the concrete barge.

    Location: Seattle, WA
    Contract:
    Dates: Jun-2008 - Jun-2008
    Client: Ivar's Inc
    Contact: Jim Seaver
    Full Description
  • Pier 55-56 Essential Pile Repair

    Work Performed

    Emergency pile repair.

    Location: Seattle, WA
    Contract:
    Dates: Oct-2008 - Oct-2008
    Client: Martin Smith, Inc
    Contact: Mark Astor
    Full Description
  • False Pass Harbor Construction

    Work Performed

    Breakwater and harbor construction.

    Location: False Pass, AK
    Contract:
    Dates: Jun-2009 - Jul-2009
    Client: Lash Corporation
    Contact: Barry Still
    Full Description

Request Services