Return
To Top

Access Trestles

PPM is experienced with end-over-end construction and marine-based trestle installations. We can provide access trestles for traffic diversion and accessing environmentally-sensitive areas. Our team installed a 4,500 LF work platform to service a water conduction line; the longest temporary work platform in the region. Access trestles have a myriad of design-build and modular construction applications and can be used to service difficult to access areas including mines.
  • 80- to 300-ton capacity work platforms
  • Driven and rock socketed supported
  • Temporary and permanent installment

What Sets us Apart

We have the specialized knowledge, equipment, and maintain the necessary pile inventory to implement access trestles for a host of applications including design-build.
Key Equipment
  • Vibratory and Impact Hammers ranging from 20k foot lbs to 400k ft lbs, fixed and vertical traveling lead systems
 

Request Services