Alaska

  • Swan Lake Expansion

    Work Performed

    The Swan Lake Hydroelectric Project is a 22 MW hydroelectric facility with a concrete thin arch dam, intake, tunnel, penstock […]


    • Location: Ketchikan, AK
    • Contract: $5-10M
    • Dates: Jun-2016 - Oct-2017
    • Contact: Eric Wolfe, P.E.

    Full Description

    Swan Lake Reservoir Expansion

    Ketchikan, AK

  • Statter Harbor Moorage

    Work Performed

    The Don Statter Harbor supports recreational and commercial vessel fleets in Auke Bay. The Master Plan envisioned reconfiguration and expansion […]


    • Location: Juneau, AK
    • Contract: < $3M
    • Dates: May-2012 - October-2013
    • Contact: Gary Gillette

    Full Description

    Statter Harbor Moorage Improvements

    Juneau, AK

  • Port of Nome

    Work Performed

    Installation of seasonally removable fenders and ladders for Nome bulkheads, replacing fendering systems damaged by ice along the East and South […]


    • Location: Nome, AK
    • Contract: < $3M
    • Dates: Aug-2013 - Feb-2015

    Full Description

    Fender, Ladder, and Harbor Lighting Foundation

    Nome, AK

  • Hydaburg Renovation

    Work Performed

    Demolition and removing of existing floating docks and utilities and installation of new in kind. Portions of the existing electric […]


    • Location: Hydaburg, AK
    • Contract: < $3M
    • Dates: Jan-2013 - Jun-2013

    Full Description

    Hydaburg Small Boat Harbor Renovation

    Hydaburg, AK

  • White Pass Dock

    Work Performed

    Retrofitted 230-ft x 60-ft barge for floating extension to a cruise ship berth. Involved construction of new and retrofitted dolphins, […]


    • Location: Skagway, AK
    • Contract: $3-5M
    • Dates: Sep-2012 - May-2013
    • Contact: Ed Hanousek

    Full Description

    Railroad Dock Floating Dock

    Skagway, AK

  • KP3 Pile Driving

    Work Performed

    Complete dock structure with crane rail supported on 88 driven and socketed piles. The replacement project is directly adjacent to […]


    • Location: Kodiak, AK
    • Contract: $29,663,000
    • Dates: Apr-2014 - Feb-2016
    • Contact: Lon White

    Full Description

    Kodiak Pier 3 Replacement

    Kodiak, AK

  • Kodiak Ferry Terminal

    Work Performed

    Demolition and removal of the existing ferry terminal including upland excavation and backfill requiring ESPC. Includes concrete deck structure, concrete […]


    • Location: Kodiak, AK
    • Contract: $13,348,000
    • Dates: Jun-2014 - May-2016
    • Contact: Todd Boris

    Full Description

    Kodiak Ferry Terminal & Dock Improvements

    Kodiak, AK

  • Christy Lee Salvage

    Work Performed

    The Christy Lee Platform, located along the western shore of Cook Inlet near the Drift River Terminal Facility, experienced catastrophic mechanical […]


    • Location: Cook Inlet, AK
    • Contract: $3,300,000
    • Dates: Mar-2012 - Oct-2012
    • Client: Global Diving & Salvage, Inc.
    • Contact: John Juettner

    Full Description

    Christy Lee Fender Salvage & Reinstallation

    Cook Inlet, AK

  • Former Kenai Facility

    Work Performed

    Furnish and place stone for shoreline rehabilitation. Included removal of existing sheet pile wall and backfill operations, providing and maintaining […]


    • Location: Kenai, AK
    • Dates: Apr-2012 - Sep-2012
    • Client: Chevron Environmental Management Company
    • Contact: Eugene Pak

    Full Description

    Former Chevron Kenai Facility

    Kenai, AK

  • Sitka Airport Extension

    Work Performed

    Sitka has a runway created largely by filling in between small islands facing the Gulf of Alaska. The runway is […]


    • Location: Sitka, AK
    • Contract: $24,500,000
    • Dates: Dec-2010 - Feb-2013
    • Client: AK Dept. of Transportation
    • Contact: Todd Fleming

    Full Description

    Sitka-Rocky Guitierrez Airport Runway Safety Area Improvements

    Sitka, AK

  • Floating Breakwater

    Work Performed

    Contracted to furnish and install floating breakwaters to complete the Carl E. Moses Harbor in Unalaska. Included two concrete floating […]


    • Location: Dutch Harbor, AK
    • Contract: $12,500,000
    • Dates: Sep-2010 - Nov-2011
    • Client: US Army Corps of Engineers

    Full Description

    Carl E Moses Floating Breakwater

    Dutch Harbor, AK

  • Old Harbor City Dock

    Work Performed

    Constructed 100-ft x 60-ft steel pile-supported concrete dock. Dock was extended by mooring piles on either side, giving the facility […]


    • Location: Old Harbor, AK
    • Contract: $6,300,000
    • Dates: Apr-2011 - Aug-2011
    • Client: City of Old Harbor

    Full Description

    Old Harbor City Dock

    Old Harbor, AK

  • OSI Mooring Dolphin

    Work Performed

    Marine berth for 265-ft, 26,000-ton offshore drilling vessel Kulluk. Berth consisted of four offshore breasting dolphins using 48-in dia. pile […]


    • Location: Dutch Harbor, AK
    • Dates: Oct-2010 - Dec-2010
    • Client: Offshore Systems Inc.
    • Contact: Joey Willis

    Full Description

    Shell Mooring Facility

    Dutch Harbor, AK

  • CEM_1

    Work Performed

    Design-build construction of the Carl E Moses Small Boat Harbor. Involved fabrication and installation of hot-dip galvanized steel floats with […]


    • Location: Unalaska, AK
    • Contract: $30,400,000
    • Dates: Dec-2009 - Nov-2011
    • Client: City of Unalaska
    • Contact: Nancy Peterson

    Full Description

    Carl E Moses Boat Harbor

    Unalaska, AK

  • Surge Control_17

    Work Performed

    Constructed a partially penetrating breakwater to deflect swells from Skagway’s Small Boat Harbor. Involved driving more than 100 steel piles […]


    • Location: Skagway, AK
    • Contract: $3,300,000
    • Dates: Aug-2009 - Jan-2010
    • Client: Municipality of Skagway
    • Contact: Todd Nottingham

    Full Description

    Boat Harbor Surge Control

    Skagway, AK

  • STHH_1

    Work Performed

    Constructed new 600MT ship haul out facility consisting of steel pipe piles, composite steel, concrete deck girders and concrete abutment. […]


    • Location: Kodiak, AK
    • Contract: $10,400,000
    • Dates: Jul-2008 - Sep-2009
    • Client: City of Kodiak
    • Contact: Lon White

    Full Description

    St. Herman Harbor Boat Lift Facility

    Kodiak, AK

  • Bristol-Bay_1

    Work Performed

    Installed OPEN CELL® bull rail, 4 heavy duty barge bollards, erection and commissioning of 4 ea. 130-ft high-mast light towers, […]


    • Location: Naknek, AK
    • Contract: $2,700,000
    • Dates: Jul-2010 - Mar-2010
    • Client: Bristol Bay Borough
    • Contact: Marvin Smith

    Full Description

    Naknek Port Improvements

    Naknek, AK

  • False Pass_1

    Work Performed

    Breakwater and harbor construction.


    • Location: False Pass, AK
    • Contract: $230,000
    • Dates: Jun-2009 - Jul-2009
    • Client: Lash Corporation
    • Contact: Barry Still

    Full Description

    False Pass Harbor Construction

    False Pass, AK

  • AK-Northern Power Cell Tower

    Work Performed


    • Location: Kodiak, AK
    • Client: GCI/Alaska Digital

    Full Description

    Alaska-Northern Power Cell Tower

    Kodiak, AK

MoreLess

British Columbia

  • Bear Creek Hydro

    Work Performed

    Design-build joint venture partner of TRP contracted to construct two new greenfield hydro facilities consisting of Upper and Lower Bear […]


    • Location: Sechelt, BC
    • Contract: $54,900,000
    • Dates: Jul-2010 - Nov-2011
    • Client: Bear Hydro, LP
    • Contact: Jean-Francois Martel

    Full Description

    Bear Creek Hydroelectric Project

    Sechelt, BC

Idaho

  • Avery Landing Cleanup

    Work Performed

    Involved removing and disposing 43,000 cy of contaminated soil. Soil had been contaminated through diesel, bunker oils, and spoils from […]


    • Location: Avery, ID
    • Contract: $5-10M
    • Dates: Mar-2013 - Sep-2013
    • Contact: Terry Cundy

    Full Description

    Avery Landing Cleanup

    Avery, ID

  • US 95 SP_1

    Work Performed

    Installed temporary sheet pile crane pads for Piers 1, 2 and 3, drove test piles for test pile program, drove […]


    • Location: Sand Point, ID
    • Contract: $7,500,000
    • Dates: Oct-2008 - May-2010
    • Client: Parsons Corporation / RCI
    • Contact: Chris Zeppernick

    Full Description

    US 95 Sand Point North & South (Sandcreek Byway)

    Sand Point, ID

Montana

  • Deer Lodge

    Work Performed

    The MR8-66 Sheet Piling project for the Milwaukee Roadhouse, also known as Deer Lodge, Environmental Restoration, LLC (ER) was the […]


    • Location: Deer Lodge, MT
    • Contract: $185,695
    • Dates: Dec-2011 - Apr-2012
    • Client: Environmental Restoration, LLC
    • Contact: Mike Sulka

    Full Description

    MR8-66 Sheet Piling

    Deer Lodge, MT

  • Hebgen Dewatering

    Work Performed

    Phase I included installation of two (2) 6″ diameter dewatering wells behind the intake structure, 150′ below grade and two (2) 6″ […]


    • Location: West Yellowstone, MT
    • Contract: $702,125
    • Dates: Apr-2010 - Sep-2010
    • Client: PPL Montana, LLC
    • Contact: Carrie Harris

    Full Description

    Hebgen Dam Dewatering

    West Yellowstone, MT

  • Hebgen_1

    Work Performed

    Hebgen Dam, located near West Yellowstone, Mt, stands at over 6,500-ft in elevation tucked among the mountains. The nearest city of any […]


    • Location: West Yellowstone, MT
    • Contract: $10,400,000
    • Dates: May-2009 - May-2010
    • Client: PPL Montana, LLC
    • Contact: Carrie Harris

    Full Description

    Hebgen Cellular Cofferdam

    West Yellowstone, MT

Oregon

  • Wave Converter

    Work Performed

    Nearly half of the American population lives within 50 miles of coastlines. In 2014, the U.S. Department of Energy (DOE) […]


    • Location: Reedsport, OR
    • Contract: < $3M
    • Dates: Jul-2012 - Oct-2012
    • Client: Northwest Underwater Construction, LLC
    • Contact: Jesse Hutton

    Full Description

    Unit#1 Mooring and Buoy Installation

    Reedsport, OR

Washington

  • T5 Test Pile

    Work Performed

    The Test Pile Program at the Port of Seattle’s Terminal 5 located along the Duwamish Waterway is in preparation of the […]


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Jan-2016 - Mar-2016
    • Contact: Paul Powell Jr.

    Full Description

    Terminal 5 Test Pile Program

    Seattle, WA

  • Elwha Water Facility

    Work Performed

    Provided a 70-ton crane for the installation and removal of a super sack diversion dam. Using a clam bucket, excavated […]


    • Location: Port Angeles, WA
    • Contract: < $3M
    • Dates: Mar-2013 - Mar-2013
    • Client: Macnak Construction, LLC

    Full Description

    Corrections for Elwha Water Facility

    Port Angeles, WA

  • Fremont Siphon

    Work Performed

    Secant excavation for the North and South secant shafts.


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Jul-2015 - Dec-2015
    • Client: Stellar J Corporation
    • Contact: Jeff Walker

    Full Description

    Fremont Siphon Replacement and Odor Control Facility

    Seattle, WA

  • SFT Preservation

    Work Performed

    Replace timber trestle pile with new pile. Also included replacing the Slip 3 timber overpass walkway, asphalt paving, and other […]


    • Location: Seattle, WA
    • Contract: $638,424
    • Dates: Aug-2012 - Feb-2013
    • Contact: Barbara Olsen

    Full Description

    SR 519 Seattle Timber Trestle Preservation

    Seattle, WA

  • Post Point WWTF

    Work Performed

    Installed 321 18-in dia. or 24-in dia. augercast pile. Called for tension and compression load tests. Also installed 165 ea. […]


    • Location: Bellingham, WA
    • Contract: $2,418,000
    • Dates: Aug-2012 - Oct-2013
    • Client: Strider Construction Co., Inc.
    • Contact: James Gebhardt

    Full Description

    Post Point Waste Water Treatment Facility

    Bellingham, WA

  • Ammunition Pier Repair

    Work Performed

    The Ammunition Pier Piling Replacement consisted of the demolition, removal and replacement of 24-in dia. hollow and 18-in dia. pre-stressed concrete […]


    • Location: Port Hadlock, WA
    • Contract: $1,206,850
    • Dates: Sep-2012 -
    • Client: Reyes Construction Inc
    • Contact: Gustavo Anaya

    Full Description

    Ammunition Pier Repair

    Port Hadlock, WA

  • Bellingham Terminal

    Work Performed

    Project included demolition of existing structures at the North and Central Terminal including excavation of approximately 4,275 cy clean material […]


    • Location: Bellingham, WA
    • Contract: $3,599,000
    • Dates: Sep-2012 - Jul-2013
    • Contact: Susan French

    Full Description

    Terminal Bulkhead and Pier Repair

    Bellingham, WA

  • USO Augercast Pile

    Work Performed

    Installation of 14 ea. 24-in dia. x 60-ft depth and 12 ea. 16-in dia. x 55-ft depth reinforced augercast pile.


    • Location: Tacoma, WA
    • Contract: $120,400
    • Dates: Jun-2014 - Jul-2014
    • Client: General Mechanical, Inc.
    • Contact: Stephen Hoover

    Full Description

    Oil Refinery Augercast Pile

    Tacoma, WA

  • Pier 54

    Work Performed

    The Seattle waterfront is home to a number of iconic landmarks including the Ivar’s, Inc. seafood restaurant at Pier 54. […]


    • Location: Seattle, WA
    • Contract: $7,693, 155
    • Dates: Jun-2014 - Mar-2015
    • Contact: Joy Okazaki

    Full Description

    Pier 54 Piling and Apron Replacement

    Seattle, WA

  • MFT Demo

    Work Performed

    Demolition and removal of the existing timber Tank Farm pier and dredging of a 500-ft wide navigation channel for upland […]


    • Location: Mukilteo, WA
    • Contract: $8,491,000
    • Dates: Jun-2015 - Feb-2016
    • Contact: John Callahan

    Full Description

    Mukilteo Ferry Terminal Phase 1 Tank Farm Demolition and Dredging

    Mukilteo, WA

  • SR520 WABN Pile Install

    Work Performed

    The West Approach Bridge North (WABN) Project was a construction phase of the SR 520 Bridge Replacement and HOV Program for […]


    • Location: Seattle, WA
    • Contract: $16,545,000
    • Dates: Dec-2014 - Apr-2017
    • Client: Flatiron Construction Corp.
    • Contact: Paul Mayo

    Full Description

    SR 520 Montlake to Evergreen Pt. Bridge West Approach Bridge North

    Seattle, WA

  • Don Morse Park Phase 1

    Work Performed

    The Don Morse Memorial Park is located on the shoreline of Lake Chelan, just above the Lake Chelan Dam in the town […]


    • Location: Chelan, WA
    • Contract: $584,880
    • Dates: Apr-2012 - Apr-2013
    • Client: KRCI LLC
    • Contact: Kyle Snitily

    Full Description

    Don Morse Park Phase 1 Improvements

    Chelan, WA

  • Emergency Boat Salvage

    Work Performed

    Emergency boat salvage to recover a boat that exploded while moored in the marina. A Sequim man was installing a new […]


    • Location: Sequim, WA
    • Contract: $45,000
    • Dates: Feb-2012 - Feb-2012
    • Client: Ballard Diving & Salvage
    • Contact: Michael Eakin

    Full Description

    Emergency Boat Salvage

    Sequim, WA

  • Everett Marina Dredging

    Work Performed

    Dredging of 29,000 cubic yards of sediments in the Port’s Marina in the vicinity of the North Visitor’s Float, Fuel […]


    • Contract: $888,560
    • Dates: Nov-2011 - Apr-2012
    • Client: Port of Everett
    • Contact: John Klekotka

    Full Description

    Marina Maintenance Dredging Phase 1

    , WA

  • Kingston Marina

    Work Performed

    The Timber Pile Removal and Replacement project involved the removal and replacement of timber at the Kingston Marina. 56 pile were removed  […]


    • Location: Kingston, WA
    • Contract: < $3M
    • Dates: Dec-2011 - Feb-2012
    • Client: Port of Kingston
    • Contact: Bruce MacIntyre

    Full Description

    Timber Pile Removal and Replacement

    Kingston, WA

  • Skagit River Bridge Dolphin

    Work Performed

    Remove existing structure and furnish and install 54-in diameter steel pipe pile utilizing bubble curtain system.


    • Location: Mount Vernon, WA
    • Contract: $205,000
    • Dates: Nov-2011 - Dec-2011
    • Client: WA Dept. of Transportation
    • Contact: Mark Hammer

    Full Description

    SR536 Skagit River Bridge Dolphin Replacement

    Mount Vernon, WA

  • Skagit River Bridge

    Work Performed

    Emergency repair of a portion of the Skagit River Bridge that collapsed near Mount Vernon after a semi-truck struck critical steel […]


    • Location: Mount Vernon, WA
    • Contract: $1,800,000
    • Dates: May-2013 - Aug-2013
    • Client: Guy F. Atkinson
    • Contact: Al Gonzales

    Full Description

    I-5 Skagit Bridge Collapse

    Mount Vernon, WA

  • Sumner WWTF

    Work Performed

    Furnish and install complete and functional vinyl sheet pile retaining wall and vinyl sheet pile wall cap. Included 10,320 sqft vinyl […]


    • Location: Sumner, WA
    • Contract: $250,000
    • Dates: Oct-2011 - Mar-2012
    • Client: Peas & Sons, Inc.
    • Contact: Bryan Hilleman

    Full Description

    Sumner WWTF Perimeter Wall

    Sumner, WA

  • White Center Bridge

    Work Performed

    Improvement and retrofit of pre-weathered steel tied-arch pedestrian bridge over wetland area near the southeast corner of White Center Heights […]


    • Location: White Center, WA
    • Contract: $360,000
    • Dates: Nov-2011 - May-2012
    • Client: King County
    • Contact: Caraline Whalen

    Full Description

    White Center Heights Bridge Repair

    White Center, WA

  • Fun Forest Redevelopment

    Work Performed

    Install 890 LF of 18-in augercast piling.


    • Location: Seattle, WA
    • Dates: Jul-2011 - Oct-2011
    • Client: Schuchart Corporation
    • Contact: Jason Sturgeon

    Full Description

    Chihuly Garden & Glass Museum

    Seattle, WA

  • Sunset Highway Improvements

    Work Performed

    Furnish and installation of steel test pile and 730 LF production pile.


    • Location: Cashmere, WA
    • Dates: Aug-2011 - Nov-2011
    • Client: Selland Construction, Inc.
    • Contact: Jordan Flowers

    Full Description

    Sunset Highway Improvements

    Cashmere, WA

  • Stadium Place

    Work Performed


    • Location: Seattle, WA
    • Contract: $2,500,000
    • Dates: Apr-2011 - Mar-2012
    • Client: JTM Construction
    • Contact: Martin O'Leary

    Full Description

    Stadium Place West Phase 2

    Seattle, WA

  • Chief Joseph Fish Hatchery

    Work Performed

    Design-build, pile supported work trestle and braced cofferdam in the Columbia River just downstream of the Chief Joseph Dam. Work […]


    • Location: Bridgeport, WA
    • Contract: $1,300,000
    • Dates: Oct-2011 - Jun-2012
    • Client: PCL Construction Services, Inc.
    • Contact: Tyler Kautz

    Full Description

    Chief Joseph Fish Hatchery

    Bridgeport, WA

  • Port Orchard Boat Recovery

    Work Performed

    Salvaged a submerged houseboat submerged near Port Orchard’s Railroad Marina. Multiple holes punctured one of the pontoons that floats the vessel […]


    • Location: Port Orchard, WA
    • Dates: Dec-2010 - Dec-2010
    • Client: Northwest Underwater Construction
    • Contact: Michael Eakin

    Full Description

    Port Orchard Boat Recovery

    Port Orchard, WA

  • Swift Reservoir Trestle

    Work Performed


    • Location: Cougar, WA
    • Contract: $9,587,000
    • Dates: Oct-2010 - Sep-2012
    • Client: Natt McDougall Company
    • Contact: Dan Phelan

    Full Description

    Lewis River Fish Passage Swift Downstream Collection Project

    Cougar, WA

  • AK Viaduct Replacement

    Work Performed

    S. Holgate to S. King Street. Furnished, spliced and drove 60-in. dia., 36-in. diameter, 20-in. diameter and 16-in. dia. steel […]


    • Location: Seattle, WA
    • Contract: $10,500,000
    • Dates: Apr-2010 - Mar-2012
    • Client: Skanska USA Civil Northwest, Inc.
    • Contact: Tim O'Neill

    Full Description

    SR99 Alaska Way Viaduct Removal

    Seattle, WA

  • Recovery & Transfer Center

    Work Performed

    Installation of concrete filled steel piles including rebar cages. Also included soldier pile retaining wall, temporary shoring wall, and associated […]


    • Location: Tacoma, WA
    • Contract: $980,000
    • Dates: Jul-2010 - Sep-2011
    • Client: JE Dunn Construction Company
    • Contact: Greg Jasper

    Full Description

    Tacoma Recovery & Transfer Center

    Tacoma, WA

  • Asarco Pier and Piling

    Work Performed

    Demolition and removal of more than 2,500 creosote-treated piling and three timber docks at Classified Superfund site. Load and transport […]


    • Location: Tacoma, WA
    • Contract: $2,300,000
    • Dates: Sep-2010 - Feb-2011
    • Client: Dept. of Natural Resources
    • Contact: Tim Goodman

    Full Description

    Asarco Pier & Piling Removal

    Tacoma, WA

  • Ebey Bridge Replacement

    Work Performed

    Replaced existing two-lane steel bridge with four-lane, fixed-span steel bridge for the WA Dept. of Transportation. Installed 48-in and 72-in […]


    • Location: Marysville, WA
    • Contract: $4,125,000
    • Dates: Sep-2010 - Jan-2011
    • Client: Granite Construction Company
    • Contact: Jacob Zacharda

    Full Description

    Ebey Slough Bridge Replacement

    Marysville, WA

  • SeaTac Duck Ponds

    Work Performed

    Furnish and install steel pipe piles for site preparation in four locations.


    • Location: Seattle, WA
    • Contract: $275,000
    • Dates: Aug-2009 - Sep-2009
    • Client: Ceccanti, Inc

    Full Description

    Seattle-Tacoma International Modernization

    Seattle, WA

  • Larimar Lowell Rd

    Work Performed

    Installed AZ-18 sheet piles using 25-B Crane with an ICE Model 28C vibratory hammer. Sheet pile wall alignment maintained by […]


    • Location: Everett, WA
    • Dates: Aug-2009 - Aug-2009
    • Client: Northwest Cascade Inc
    • Contact: Evan Newman

    Full Description

    Wolf Creek Sheet Pile

    Everett, WA

  • Argosy Dock

    Work Performed

    Cut off sheets, place rock backfill, and install walkway on top of sheets.


    • Location: Seattle, WA
    • Dates: Sep-2008 - Sep-2008
    • Client: Argosy Cruises
    • Contact: Don Wicklund

    Full Description

    West Seattle Dock Repair

    Seattle, WA

  • Barker Creek

    Work Performed

    Furnish, install, and remove sheet pile shoring.


    • Location: Silverdale, WA
    • Contract: $350,000
    • Dates: Aug-2008 - Oct-2008
    • Client: McDonald & Company, Inc
    • Contact: Steve McDonald

    Full Description

    Barker Creek Culvert Replacement

    Silverdale, WA

  • Sunnyside WWTF

    Work Performed

    Furnish and install 133 foundation and shoring piles including 145LF of whaler material.


    • Location: Everett, WA
    • Contract: $130,500
    • Dates: May-2010 - Sep-2010
    • Client: Balfour Beatty Infrastructure, Inc.
    • Contact: Virgil Curtis

    Full Description

    Sunnyside Wastewater Treatment Facilities

    Everett, WA

  • Pacific Pile & Marine

    Work Performed

    Emergency boat salvage.


    • Location: Seattle, WA
    • Dates: Nov-2009 - Dec-2009
    • Client: Northwest Underwater Construction
    • Contact: Jesse Hutton

    Full Description

    NRC Boat Recovery

    Seattle, WA

  • Flounder_1

    Work Performed

    Maintenance dredge project to restore the marina to prior dredged elevations. Included navigation pile removal and reinstallation. Dredging consisted of […]


    • Location: Anacortes, WA
    • Contract: $1,300,000
    • Dates: Aug-2010 - Oct-2010
    • Client: City of Anacortes
    • Contact: Rob Webb

    Full Description

    Flounder Bay Marina Dreding

    Anacortes, WA

  • DCI_1

    Work Performed

    Major redevelopment and expansion of the DCI Shipyard. Phase I included demolition and removal of 24,000 sq ft of dock […]


    • Location: Anacortes, WA
    • Contract: $14,100,000
    • Dates: May-2008 - Dec-2009
    • Client: Dakota Creek Industries
    • Contact: Mike Nelson

    Full Description

    DCI Shipyard Redevelopment

    Anacortes, WA

  • Scott_12

    Work Performed

    The Scott Paper Mill Project  was a multi-phase project to clean up the offshore and near-shore areas of the former […]


    • Location: Anacortes, WA
    • Contract: $11,600,000
    • Dates: Oct-2009 - Jan-2011
    • Client: Port of Anacortes
    • Contact: Becky Darden

    Full Description

    Former Scott Paper Mill Cleanup

    Anacortes, WA

  • T115_18

    Work Performed

    Superfund site. Built new barge loading and unloading facility. Involved sheet pile, upland and in-water pile driving, contaminated dredging, demolition […]


    • Location: Seattle, WA
    • Contract: $2,800,000
    • Dates: Dec-2009 - Apr-2010
    • Client: Port of Seattle
    • Contact: Jerry Dowd

    Full Description

    Terminal 115 Berth Modifications

    Seattle, WA

  • OCH_1

    Work Performed

    Drove test piles including PDA testing and re-strikes, installation of precast piles, cut off piles and offload for storage of […]


    • Location: Olympia, WA
    • Contract: $475,000
    • Dates: May-2009 - Jul-2009
    • Client: Hoffman Construction Company
    • Contact: Brent Anderson

    Full Description

    Olympia City Hall

    Olympia, WA

  • MTB_6

    Work Performed

    Maintenance dredged 9,700 cubic yards of contaminated material along the port facility pier. The dredge sediment was then transported by […]


    • Location: Olympia, WA
    • Contract: $1,600,000
    • Dates: Jan-2009 - Mar-2009
    • Client: Port of Olympia
    • Contact: Rick Anderson

    Full Description

    Marine Terminal Berths 2 & 3 Interim Action Dredging

    Olympia, WA

  • Ebey Trestle_1

    Work Performed

    In coordination with Ruskin Construction, PPM was contracted to perform substructure work to the construction of a 4,300-ft pile-supported water […]


    • Location: Everett, WA
    • Contract: $8,500,000
    • Dates: Feb-2008 - Mar-2010
    • Client: Tri-State Construction, Inc
    • Contact: Paul Clements

    Full Description

    Ebey Slough Trestle Installation

    Everett, WA

  • Nalley Valley_1

    Work Performed

    Furnished and drove steel test pile, furnished ST piling, drove ST pile and furnished steel pile tip/shoe.


    • Location: Nalley Valley, WA
    • Contract: $639,000
    • Dates: Apr-2009 - May-2010
    • Client: Guy F. Atkinson Construction
    • Contact: Dave Doles

    Full Description

    I-5 / SR 16 Westbound Nalley Valley Interchange

    Nalley Valley, WA

  • 10th St Marine Park_1

    Work Performed

    Installed 80-ft gangway and floatation billets. Installed gangway concrete abutment and approach slab and handrail.


    • Location: Everett, WA
    • Contract: $119,800
    • Dates: May-2009 - May-2010
    • Client: Grade, Inc
    • Contact: Kreg Oveson

    Full Description

    10th Street Marine Park Shore Projection

    Everett, WA

  • Pine Lake_1

    Work Performed

    Constructed 16-ft wide float sections with DF decking. Constructed 12-ft wide float sections with thru-flow DF decking. Drove test piles, […]


    • Location: Sammamish, WA
    • Contract: $468,000
    • Dates: Feb-2009 - Mar-2009
    • Client: Dept. of Parks and Recreation
    • Contact: Jack Seipel

    Full Description

    Pine Lake Park Phase II Dock Construction

    Sammamish, WA

  • Seabeck_14

    Work Performed

    Marina restoration. Replaced the existing dilapidated Seabeck Marina, condemned in 2005, with a 200-slip marina along the downtown Seabeck waterfront. […]


    • Location: Seabeck, WA
    • Contract: $350,000
    • Dates: Mar-2010 - Apr-2010
    • Client: Olympic View Marina, LLC
    • Contact: Boyer Halvorsen

    Full Description

    Seabeck Marina

    Seabeck, WA

  • POT HOV_1

    Work Performed

    Furnish and install 60 concrete test pile and 120 ea. 14-in dia. concrete production pile; approx 12,256 LF installed.


    • Location: Fife, WA
    • Contract: $955,000
    • Dates: Jul-2009 - Jun-2010
    • Client: Tri-State Construction, Inc
    • Contact: Paul Clement

    Full Description

    Port of Tacoma Rd to King County Line – HOV

    Fife, WA

  • Snohomish_1

    Work Performed

    Pile driving at various locations within Snohomish County.


    • Location: Everett, WA
    • Contract: $104,000
    • Dates: Jul-2009 - Aug-2009
    • Client: Snohomish County Purchasing Division
    • Contact: Donald Wolfe

    Full Description

    Snohomish County Various Locations

    Everett, WA

  • Des Moines Marina

    Work Performed

    Dredged boat ramp area, southern outfall and northern outfall. Removed and offloaded pile. Dredged unsuitable sediments in the entrance channel […]


    • Location: Des Moines, WA
    • Contract: $430,000
    • Dates: Jan-2009 - Jan-2009
    • Client: City of Des Moines
    • Contact: Joe Dusenbury

    Full Description

    Des Moines Marina Maintenance Dredge

    Des Moines, WA

  • Lake WA_16

    Work Performed

    Deconstruction of two derelict sunken dry docks in 25-ft of water. Dry docks were too sunken to be easily raised. […]


    • Location: Renton, WA
    • Contract: $1,900,000
    • Dates: Jul-2008 - Feb-2009
    • Client: Dept. of Natural Resources
    • Contact: Melissa Ferris

    Full Description

    Lake WA Dry Dock Removal

    Renton, WA

  • Pier 54-55_1

    Work Performed

    Dock and foundation repairs. Installed 180 cf  of floatation under the existing moorage adjacent to the concrete barge.


    • Location: Seattle, WA
    • Dates: Jun-2008 - Jun-2008
    • Client: Ivar's Inc
    • Contact: Jim Seaver

    Full Description

    Pier 54-55

    Seattle, WA

  • Pier 55-56_1

    Work Performed

    Emergency pile repair.


    • Location: Seattle, WA
    • Contract: $440,000
    • Dates: Oct-2008 - Oct-2008
    • Client: Martin Smith, Inc
    • Contact: Mark Astor

    Full Description

    Pier 55-56 Essential Pile Repair

    Seattle, WA

  • Wiley_1

    Work Performed

    Furnished and installed permanent sheet for cut-off wall. Furnished, installed and removed two temporary sheet pile cut-off walls approximately 46 […]


    • Location: Mount Vernon, WA
    • Contract: $160,000
    • Dates: Aug-2008 - Oct-2008
    • Client: Northwest Construction, Inc
    • Contact: Ian Slater

    Full Description

    Wiley Slough Estuary Restoration Phase I

    Mount Vernon, WA

  • FWSP_1

    Work Performed

    Provided and installed 210 LF of new steel sheet pile wall at minimum 45-ft depth along the margin of Haug […]


    • Location: Hunts Point, WA
    • Contract: $428,000
    • Dates: Jun-2008 - Oct-2008
    • Client: Town of Hunts Point
    • Contact: Joe Willis

    Full Description

    Fairweather Place Steel Sheet Pile Wall

    Hunts Point, WA

MoreLess

Request Services