Projects Archive

  • Swift Reservoir Trestle

    Work Performed


    • Location: Cougar, WA
    • Contract: $9,587,000
    • Dates: Oct-2010 - Sep-2012
    • Client: Natt McDougall Company
    • Contact: Dan Phelan

    Full Description

    Lewis River Fish Passage Swift Downstream Collection Project

    Cougar, WA

  • Sitka Airport Extension

    Work Performed

    Sitka has a runway created largely by filling in between small islands facing the Gulf of Alaska. The runway is […]


    • Location: Sitka, AK
    • Contract: $24,500,000
    • Dates: Dec-2010 - Feb-2013
    • Client: AK Dept. of Transportation
    • Contact: Todd Fleming

    Full Description

    Sitka-Rocky Guitierrez Airport Runway Safety Area Improvements

    Sitka, AK

  • Floating Breakwater

    Work Performed

    Contracted to furnish and install floating breakwaters to complete the Carl E. Moses Harbor in Unalaska. Included two concrete floating […]


    • Location: Dutch Harbor, AK
    • Contract: $12,500,000
    • Dates: Sep-2010 - Nov-2011
    • Client: US Army Corps of Engineers

    Full Description

    Carl E Moses Floating Breakwater

    Dutch Harbor, AK

  • Old Harbor City Dock

    Work Performed

    Constructed 100-ft x 60-ft steel pile-supported concrete dock. Dock was extended by mooring piles on either side, giving the facility […]


    • Location: Old Harbor, AK
    • Contract: $6,300,000
    • Dates: Apr-2011 - Aug-2011
    • Client: City of Old Harbor

    Full Description

    Old Harbor City Dock

    Old Harbor, AK

  • OSI Mooring Dolphin

    Work Performed

    Marine berth for 265-ft, 26,000-ton offshore drilling vessel Kulluk. Berth consisted of four offshore breasting dolphins using 48-in dia. pile […]


    • Location: Dutch Harbor, AK
    • Dates: Oct-2010 - Dec-2010
    • Client: Offshore Systems Inc.
    • Contact: Joey Willis

    Full Description

    Shell Mooring Facility

    Dutch Harbor, AK

  • AK Viaduct Replacement

    Work Performed

    S. Holgate to S. King Street. Furnished, spliced and drove 60-in. dia., 36-in. diameter, 20-in. diameter and 16-in. dia. steel […]


    • Location: Seattle, WA
    • Contract: $10,500,000
    • Dates: Apr-2010 - Mar-2012
    • Client: Skanska USA Civil Northwest, Inc.
    • Contact: Tim O'Neill

    Full Description

    SR99 Alaska Way Viaduct Removal

    Seattle, WA

  • Recovery & Transfer Center

    Work Performed

    Installation of concrete filled steel piles including rebar cages. Also included soldier pile retaining wall, temporary shoring wall, and associated […]


    • Location: Tacoma, WA
    • Contract: $980,000
    • Dates: Jul-2010 - Sep-2011
    • Client: JE Dunn Construction Company
    • Contact: Greg Jasper

    Full Description

    Tacoma Recovery & Transfer Center

    Tacoma, WA

  • Asarco Pier and Piling

    Work Performed

    Demolition and removal of more than 2,500 creosote-treated piling and three timber docks at Classified Superfund site. Load and transport […]


    • Location: Tacoma, WA
    • Contract: $2,300,000
    • Dates: Sep-2010 - Feb-2011
    • Client: Dept. of Natural Resources
    • Contact: Tim Goodman

    Full Description

    Asarco Pier & Piling Removal

    Tacoma, WA

  • Bear Creek Hydro

    Work Performed

    Design-build joint venture partner of TRP contracted to construct two new greenfield hydro facilities consisting of Upper and Lower Bear […]


    • Location: Sechelt, BC
    • Contract: $54,900,000
    • Dates: Jul-2010 - Nov-2011
    • Client: Bear Hydro, LP
    • Contact: Jean-Francois Martel

    Full Description

    Bear Creek Hydroelectric Project

    Sechelt, BC

  • Ebey Bridge Replacement

    Work Performed

    Replaced existing two-lane steel bridge with four-lane, fixed-span steel bridge for the WA Dept. of Transportation. Installed 48-in and 72-in […]


    • Location: Marysville, WA
    • Contract: $4,125,000
    • Dates: Sep-2010 - Jan-2011
    • Client: Granite Construction Company
    • Contact: Jacob Zacharda

    Full Description

    Ebey Slough Bridge Replacement

    Marysville, WA

  • SeaTac Duck Ponds

    Work Performed

    Furnish and install steel pipe piles for site preparation in four locations.


    • Location: Seattle, WA
    • Contract: $275,000
    • Dates: Aug-2009 - Sep-2009
    • Client: Ceccanti, Inc

    Full Description

    Seattle-Tacoma International Modernization

    Seattle, WA

  • Larimar Lowell Rd

    Work Performed

    Installed AZ-18 sheet piles using 25-B Crane with an ICE Model 28C vibratory hammer. Sheet pile wall alignment maintained by […]


    • Location: Everett, WA
    • Dates: Aug-2009 - Aug-2009
    • Client: Northwest Cascade Inc
    • Contact: Evan Newman

    Full Description

    Wolf Creek Sheet Pile

    Everett, WA

  • Argosy Dock

    Work Performed

    Cut off sheets, place rock backfill, and install walkway on top of sheets.


    • Location: Seattle, WA
    • Dates: Sep-2008 - Sep-2008
    • Client: Argosy Cruises
    • Contact: Don Wicklund

    Full Description

    West Seattle Dock Repair

    Seattle, WA

  • Barker Creek

    Work Performed

    Furnish, install, and remove sheet pile shoring.


    • Location: Silverdale, WA
    • Contract: $350,000
    • Dates: Aug-2008 - Oct-2008
    • Client: McDonald & Company, Inc
    • Contact: Steve McDonald

    Full Description

    Barker Creek Culvert Replacement

    Silverdale, WA

  • Hebgen Dewatering

    Work Performed

    Phase I included installation of two (2) 6″ diameter dewatering wells behind the intake structure, 150′ below grade and two (2) 6″ […]


    • Location: West Yellowstone, MT
    • Contract: $702,125
    • Dates: Apr-2010 - Sep-2010
    • Client: PPL Montana, LLC
    • Contact: Carrie Harris

    Full Description

    Hebgen Dam Dewatering

    West Yellowstone, MT

  • Sunnyside WWTF

    Work Performed

    Furnish and install 133 foundation and shoring piles including 145LF of whaler material.


    • Location: Everett, WA
    • Contract: $130,500
    • Dates: May-2010 - Sep-2010
    • Client: Balfour Beatty Infrastructure, Inc.
    • Contact: Virgil Curtis

    Full Description

    Sunnyside Wastewater Treatment Facilities

    Everett, WA

  • Pacific Pile & Marine

    Work Performed

    Emergency boat salvage.


    • Location: Seattle, WA
    • Dates: Nov-2009 - Dec-2009
    • Client: Northwest Underwater Construction
    • Contact: Jesse Hutton

    Full Description

    NRC Boat Recovery

    Seattle, WA

  • Flounder_1

    Work Performed

    Maintenance dredge project to restore the marina to prior dredged elevations. Included navigation pile removal and reinstallation. Dredging consisted of […]


    • Location: Anacortes, WA
    • Contract: $1,300,000
    • Dates: Aug-2010 - Oct-2010
    • Client: City of Anacortes
    • Contact: Rob Webb

    Full Description

    Flounder Bay Marina Dreding

    Anacortes, WA

Request Services