Projects Archive

  • Avery Landing Cleanup

    Work Performed

    Involved removing and disposing 43,000 cy of contaminated soil. Soil had been contaminated through diesel, bunker oils, and spoils from […]


    • Location: Avery, ID
    • Contract: $5-10M
    • Dates: Mar-2013 - Sep-2013
    • Contact: Terry Cundy

    Full Description

    Avery Landing Cleanup

    Avery, ID

  • Elwha Water Facility

    Work Performed

    Provided a 70-ton crane for the installation and removal of a super sack diversion dam. Using a clam bucket, excavated […]


    • Location: Port Angeles, WA
    • Contract: < $3M
    • Dates: Mar-2013 - Mar-2013
    • Client: Macnak Construction, LLC

    Full Description

    Corrections for Elwha Water Facility

    Port Angeles, WA

  • Fremont Siphon

    Work Performed

    Secant excavation for the North and South secant shafts.


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Jul-2015 - Dec-2015
    • Client: Stellar J Corporation
    • Contact: Jeff Walker

    Full Description

    Fremont Siphon Replacement and Odor Control Facility

    Seattle, WA

  • Post Point WWTF

    Work Performed

    Installed 321 18-in dia. or 24-in dia. augercast pile. Called for tension and compression load tests. Also installed 165 ea. […]


    • Location: Bellingham, WA
    • Contract: $2,418,000
    • Dates: Aug-2012 - Oct-2013
    • Client: Strider Construction Co., Inc.
    • Contact: James Gebhardt

    Full Description

    Post Point Waste Water Treatment Facility

    Bellingham, WA

  • Ammunition Pier Repair

    Work Performed

    The Ammunition Pier Piling Replacement consisted of the demolition, removal and replacement of 24-in dia. hollow and 18-in dia. pre-stressed concrete […]


    • Location: Port Hadlock, WA
    • Contract: $1,206,850
    • Dates: Sep-2012 -
    • Client: Reyes Construction Inc
    • Contact: Gustavo Anaya

    Full Description

    Ammunition Pier Repair

    Port Hadlock, WA

  • Bellingham Terminal

    Work Performed

    Project included demolition of existing structures at the North and Central Terminal including excavation of approximately 4,275 cy clean material […]


    • Location: Bellingham, WA
    • Contract: $3,599,000
    • Dates: Sep-2012 - Jul-2013
    • Contact: Susan French

    Full Description

    Terminal Bulkhead and Pier Repair

    Bellingham, WA

  • KP3 Pile Driving

    Work Performed

    Complete dock structure with crane rail supported on 88 driven and socketed piles. The replacement project is directly adjacent to […]


    • Location: Kodiak, AK
    • Contract: $29,663,000
    • Dates: Apr-2014 - Feb-2016
    • Contact: Lon White

    Full Description

    Kodiak Pier 3 Replacement

    Kodiak, AK

  • USO Augercast Pile

    Work Performed

    Installation of 14 ea. 24-in dia. x 60-ft depth and 12 ea. 16-in dia. x 55-ft depth reinforced augercast pile.


    • Location: Tacoma, WA
    • Contract: $120,400
    • Dates: Jun-2014 - Jul-2014
    • Client: General Mechanical, Inc.
    • Contact: Stephen Hoover

    Full Description

    Oil Refinery Augercast Pile

    Tacoma, WA

  • Don Morse Park Phase 1

    Work Performed

    The Don Morse Memorial Park is located on the shoreline of Lake Chelan, just above the Lake Chelan Dam in the town […]


    • Location: Chelan, WA
    • Contract: $584,880
    • Dates: Apr-2012 - Apr-2013
    • Client: KRCI LLC
    • Contact: Kyle Snitily

    Full Description

    Don Morse Park Phase 1 Improvements

    Chelan, WA

  • Deer Lodge

    Work Performed

    The MR8-66 Sheet Piling project for the Milwaukee Roadhouse, also known as Deer Lodge, Environmental Restoration, LLC (ER) was the […]


    • Location: Deer Lodge, MT
    • Contract: $185,695
    • Dates: Dec-2011 - Apr-2012
    • Client: Environmental Restoration, LLC
    • Contact: Mike Sulka

    Full Description

    MR8-66 Sheet Piling

    Deer Lodge, MT

  • Former Kenai Facility

    Work Performed

    Furnish and place stone for shoreline rehabilitation. Included removal of existing sheet pile wall and backfill operations, providing and maintaining […]


    • Location: Kenai, AK
    • Dates: Apr-2012 - Sep-2012
    • Client: Chevron Environmental Management Company
    • Contact: Eugene Pak

    Full Description

    Former Chevron Kenai Facility

    Kenai, AK

  • Sumner WWTF

    Work Performed

    Furnish and install complete and functional vinyl sheet pile retaining wall and vinyl sheet pile wall cap. Included 10,320 sqft vinyl […]


    • Location: Sumner, WA
    • Contract: $250,000
    • Dates: Oct-2011 - Mar-2012
    • Client: Peas & Sons, Inc.
    • Contact: Bryan Hilleman

    Full Description

    Sumner WWTF Perimeter Wall

    Sumner, WA

  • White Center Bridge

    Work Performed

    Improvement and retrofit of pre-weathered steel tied-arch pedestrian bridge over wetland area near the southeast corner of White Center Heights […]


    • Location: White Center, WA
    • Contract: $360,000
    • Dates: Nov-2011 - May-2012
    • Client: King County
    • Contact: Caraline Whalen

    Full Description

    White Center Heights Bridge Repair

    White Center, WA

  • Fun Forest Redevelopment

    Work Performed

    Install 890 LF of 18-in augercast piling.


    • Location: Seattle, WA
    • Dates: Jul-2011 - Oct-2011
    • Client: Schuchart Corporation
    • Contact: Jason Sturgeon

    Full Description

    Chihuly Garden & Glass Museum

    Seattle, WA

  • Sunset Highway Improvements

    Work Performed

    Furnish and installation of steel test pile and 730 LF production pile.


    • Location: Cashmere, WA
    • Dates: Aug-2011 - Nov-2011
    • Client: Selland Construction, Inc.
    • Contact: Jordan Flowers

    Full Description

    Sunset Highway Improvements

    Cashmere, WA

  • Stadium Place

    Work Performed


    • Location: Seattle, WA
    • Contract: $2,500,000
    • Dates: Apr-2011 - Mar-2012
    • Client: JTM Construction
    • Contact: Martin O'Leary

    Full Description

    Stadium Place West Phase 2

    Seattle, WA

  • AK Viaduct Replacement

    Work Performed

    S. Holgate to S. King Street. Furnished, spliced and drove 60-in. dia., 36-in. diameter, 20-in. diameter and 16-in. dia. steel […]


    • Location: Seattle, WA
    • Contract: $10,500,000
    • Dates: Apr-2010 - Mar-2012
    • Client: Skanska USA Civil Northwest, Inc.
    • Contact: Tim O'Neill

    Full Description

    SR99 Alaska Way Viaduct Removal

    Seattle, WA

  • Recovery & Transfer Center

    Work Performed

    Installation of concrete filled steel piles including rebar cages. Also included soldier pile retaining wall, temporary shoring wall, and associated […]


    • Location: Tacoma, WA
    • Contract: $980,000
    • Dates: Jul-2010 - Sep-2011
    • Client: JE Dunn Construction Company
    • Contact: Greg Jasper

    Full Description

    Tacoma Recovery & Transfer Center

    Tacoma, WA

Request Services