  • T5 Test Pile

    Work Performed

    The Test Pile Program at the Port of Seattle’s Terminal 5 located along the Duwamish Waterway is in preparation of the […]


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Jan-2016 - Mar-2016
    • Contact: Paul Powell Jr.

    Full Description

    Terminal 5 Test Pile Program

    Seattle, WA

  • Statter Harbor Moorage

    Work Performed

    The Don Statter Harbor supports recreational and commercial vessel fleets in Auke Bay. The Master Plan envisioned reconfiguration and expansion […]


    • Location: Juneau, AK
    • Contract: < $3M
    • Dates: May-2012 - October-2013
    • Contact: Gary Gillette

    Full Description

    Statter Harbor Moorage Improvements

    Juneau, AK

  • White Pass Dock

    Work Performed

    Retrofitted 230-ft x 60-ft barge for floating extension to a cruise ship berth. Involved construction of new and retrofitted dolphins, […]


    • Location: Skagway, AK
    • Contract: $3-5M
    • Dates: Sep-2012 - May-2013
    • Contact: Ed Hanousek

    Full Description

    Railroad Dock Floating Dock

    Skagway, AK

  • SFT Preservation

    Work Performed

    Replace timber trestle pile with new pile. Also included replacing the Slip 3 timber overpass walkway, asphalt paving, and other […]


    • Location: Seattle, WA
    • Contract: $638,424
    • Dates: Aug-2012 - Feb-2013
    • Contact: Barbara Olsen

    Full Description

    SR 519 Seattle Timber Trestle Preservation

    Seattle, WA

  • Post Point WWTF

    Work Performed

    Installed 321 18-in dia. or 24-in dia. augercast pile. Called for tension and compression load tests. Also installed 165 ea. […]


    • Location: Bellingham, WA
    • Contract: $2,418,000
    • Dates: Aug-2012 - Oct-2013
    • Client: Strider Construction Co., Inc.
    • Contact: James Gebhardt

    Full Description

    Post Point Waste Water Treatment Facility

    Bellingham, WA

  • Ammunition Pier Repair

    Work Performed

    The Ammunition Pier Piling Replacement consisted of the demolition, removal and replacement of 24-in dia. hollow and 18-in dia. pre-stressed concrete […]


    • Location: Port Hadlock, WA
    • Contract: $1,206,850
    • Dates: Sep-2012 -
    • Client: Reyes Construction Inc
    • Contact: Gustavo Anaya

    Full Description

    Ammunition Pier Repair

    Port Hadlock, WA

  • KP3 Pile Driving

    Work Performed

    Complete dock structure with crane rail supported on 88 driven and socketed piles. The replacement project is directly adjacent to […]


    • Location: Kodiak, AK
    • Contract: $29,663,000
    • Dates: Apr-2014 - Feb-2016
    • Contact: Lon White

    Full Description

    Kodiak Pier 3 Replacement

    Kodiak, AK

  • USO Augercast Pile

    Work Performed

    Installation of 14 ea. 24-in dia. x 60-ft depth and 12 ea. 16-in dia. x 55-ft depth reinforced augercast pile.


    • Location: Tacoma, WA
    • Contract: $120,400
    • Dates: Jun-2014 - Jul-2014
    • Client: General Mechanical, Inc.
    • Contact: Stephen Hoover

    Full Description

    Oil Refinery Augercast Pile

    Tacoma, WA

  • Kodiak Ferry Terminal

    Work Performed

    Demolition and removal of the existing ferry terminal including upland excavation and backfill requiring ESPC. Includes concrete deck structure, concrete […]


    • Location: Kodiak, AK
    • Contract: $13,348,000
    • Dates: Jun-2014 - May-2016
    • Contact: Todd Boris

    Full Description

    Kodiak Ferry Terminal & Dock Improvements

    Kodiak, AK

  • Pier 54

    Work Performed

    The Seattle waterfront is home to a number of iconic landmarks including the Ivar’s, Inc. seafood restaurant at Pier 54. […]


    • Location: Seattle, WA
    • Contract: $7,693, 155
    • Dates: Jun-2014 - Mar-2015
    • Contact: Joy Okazaki

    Full Description

    Pier 54 Piling and Apron Replacement

    Seattle, WA

  • SR520 WABN Pile Install

    Work Performed

    The West Approach Bridge North (WABN) Project was a construction phase of the SR 520 Bridge Replacement and HOV Program for […]


    • Location: Seattle, WA
    • Contract: $16,545,000
    • Dates: Dec-2014 - Apr-2017
    • Client: Flatiron Construction Corp.
    • Contact: Paul Mayo

    Full Description

    SR 520 Montlake to Evergreen Pt. Bridge West Approach Bridge North

    Seattle, WA

  • Don Morse Park Phase 1

    Work Performed

    The Don Morse Memorial Park is located on the shoreline of Lake Chelan, just above the Lake Chelan Dam in the town […]


    • Location: Chelan, WA
    • Contract: $584,880
    • Dates: Apr-2012 - Apr-2013
    • Client: KRCI LLC
    • Contact: Kyle Snitily

    Full Description

    Don Morse Park Phase 1 Improvements

    Chelan, WA

  • Deer Lodge

    Work Performed

    The MR8-66 Sheet Piling project for the Milwaukee Roadhouse, also known as Deer Lodge, Environmental Restoration, LLC (ER) was the […]


    • Location: Deer Lodge, MT
    • Contract: $185,695
    • Dates: Dec-2011 - Apr-2012
    • Client: Environmental Restoration, LLC
    • Contact: Mike Sulka

    Full Description

    MR8-66 Sheet Piling

    Deer Lodge, MT

  • Kingston Marina

    Work Performed

    The Timber Pile Removal and Replacement project involved the removal and replacement of timber at the Kingston Marina. 56 pile were removed  […]


    • Location: Kingston, WA
    • Contract: < $3M
    • Dates: Dec-2011 - Feb-2012
    • Client: Port of Kingston
    • Contact: Bruce MacIntyre

    Full Description

    Timber Pile Removal and Replacement

    Kingston, WA

  • Skagit River Bridge Dolphin

    Work Performed

    Remove existing structure and furnish and install 54-in diameter steel pipe pile utilizing bubble curtain system.


    • Location: Mount Vernon, WA
    • Contract: $205,000
    • Dates: Nov-2011 - Dec-2011
    • Client: WA Dept. of Transportation
    • Contact: Mark Hammer

    Full Description

    SR536 Skagit River Bridge Dolphin Replacement

    Mount Vernon, WA

  • White Center Bridge

    Work Performed

    Improvement and retrofit of pre-weathered steel tied-arch pedestrian bridge over wetland area near the southeast corner of White Center Heights […]


    • Location: White Center, WA
    • Contract: $360,000
    • Dates: Nov-2011 - May-2012
    • Client: King County
    • Contact: Caraline Whalen

    Full Description

    White Center Heights Bridge Repair

    White Center, WA

  • Fun Forest Redevelopment

    Work Performed

    Install 890 LF of 18-in augercast piling.


    • Location: Seattle, WA
    • Dates: Jul-2011 - Oct-2011
    • Client: Schuchart Corporation
    • Contact: Jason Sturgeon

    Full Description

    Chihuly Garden & Glass Museum

    Seattle, WA

  • Stadium Place

    Work Performed


    • Location: Seattle, WA
    • Contract: $2,500,000
    • Dates: Apr-2011 - Mar-2012
    • Client: JTM Construction
    • Contact: Martin O'Leary

    Full Description

    Stadium Place West Phase 2

    Seattle, WA