Projects Archive

  • T5 Test Pile

    Work Performed

    The Test Pile Program at the Port of Seattle’s Terminal 5 located along the Duwamish Waterway is in preparation of the […]


    • Location: Seattle, WA
    • Contract: < $3M
    • Dates: Jan-2016 - Mar-2016
    • Contact: Paul Powell Jr.

    Full Description

    Terminal 5 Test Pile Program

    Seattle, WA

  • Statter Harbor Moorage

    Work Performed

    The Don Statter Harbor supports recreational and commercial vessel fleets in Auke Bay. The Master Plan envisioned reconfiguration and expansion […]


    • Location: Juneau, AK
    • Contract: < $3M
    • Dates: May-2012 - October-2013
    • Contact: Gary Gillette

    Full Description

    Statter Harbor Moorage Improvements

    Juneau, AK

  • Hydaburg Renovation

    Work Performed

    Demolition and removing of existing floating docks and utilities and installation of new in kind. Portions of the existing electric […]


    • Location: Hydaburg, AK
    • Contract: < $3M
    • Dates: Jan-2013 - Jun-2013

    Full Description

    Hydaburg Small Boat Harbor Renovation

    Hydaburg, AK

  • White Pass Dock

    Work Performed

    Retrofitted 230-ft x 60-ft barge for floating extension to a cruise ship berth. Involved construction of new and retrofitted dolphins, […]


    • Location: Skagway, AK
    • Contract: $3-5M
    • Dates: Sep-2012 - May-2013
    • Contact: Ed Hanousek

    Full Description

    Railroad Dock Floating Dock

    Skagway, AK

  • SFT Preservation

    Work Performed

    Replace timber trestle pile with new pile. Also included replacing the Slip 3 timber overpass walkway, asphalt paving, and other […]


    • Location: Seattle, WA
    • Contract: $638,424
    • Dates: Aug-2012 - Feb-2013
    • Contact: Barbara Olsen

    Full Description

    SR 519 Seattle Timber Trestle Preservation

    Seattle, WA

  • Ammunition Pier Repair

    Work Performed

    The Ammunition Pier Piling Replacement consisted of the demolition, removal and replacement of 24-in dia. hollow and 18-in dia. pre-stressed concrete […]


    • Location: Port Hadlock, WA
    • Contract: $1,206,850
    • Dates: Sep-2012 -
    • Client: Reyes Construction Inc
    • Contact: Gustavo Anaya

    Full Description

    Ammunition Pier Repair

    Port Hadlock, WA

  • Bellingham Terminal

    Work Performed

    Project included demolition of existing structures at the North and Central Terminal including excavation of approximately 4,275 cy clean material […]


    • Location: Bellingham, WA
    • Contract: $3,599,000
    • Dates: Sep-2012 - Jul-2013
    • Contact: Susan French

    Full Description

    Terminal Bulkhead and Pier Repair

    Bellingham, WA

  • KP3 Pile Driving

    Work Performed

    Complete dock structure with crane rail supported on 88 driven and socketed piles. The replacement project is directly adjacent to […]


    • Location: Kodiak, AK
    • Contract: $29,663,000
    • Dates: Apr-2014 - Feb-2016
    • Contact: Lon White

    Full Description

    Kodiak Pier 3 Replacement

    Kodiak, AK

  • Kodiak Ferry Terminal

    Work Performed

    Demolition and removal of the existing ferry terminal including upland excavation and backfill requiring ESPC. Includes concrete deck structure, concrete […]


    • Location: Kodiak, AK
    • Contract: $13,348,000
    • Dates: Jun-2014 - May-2016
    • Contact: Todd Boris

    Full Description

    Kodiak Ferry Terminal & Dock Improvements

    Kodiak, AK

  • Pier 54

    Work Performed

    The Seattle waterfront is home to a number of iconic landmarks including the Ivar’s, Inc. seafood restaurant at Pier 54. […]


    • Location: Seattle, WA
    • Contract: $7,693, 155
    • Dates: Jun-2014 - Mar-2015
    • Contact: Joy Okazaki

    Full Description

    Pier 54 Piling and Apron Replacement

    Seattle, WA

  • MFT Demo

    Work Performed

    Demolition and removal of the existing timber Tank Farm pier and dredging of a 500-ft wide navigation channel for upland […]


    • Location: Mukilteo, WA
    • Contract: $8,491,000
    • Dates: Jun-2015 - Feb-2016
    • Contact: John Callahan

    Full Description

    Mukilteo Ferry Terminal Phase 1 Tank Farm Demolition and Dredging

    Mukilteo, WA

  • Emergency Boat Salvage

    Work Performed

    Emergency boat salvage to recover a boat that exploded while moored in the marina. A Sequim man was installing a new […]


    • Location: Sequim, WA
    • Contract: $45,000
    • Dates: Feb-2012 - Feb-2012
    • Client: Ballard Diving & Salvage
    • Contact: Michael Eakin

    Full Description

    Emergency Boat Salvage

    Sequim, WA

  • Kingston Marina

    Work Performed

    The Timber Pile Removal and Replacement project involved the removal and replacement of timber at the Kingston Marina. 56 pile were removed  […]


    • Location: Kingston, WA
    • Contract: < $3M
    • Dates: Dec-2011 - Feb-2012
    • Client: Port of Kingston
    • Contact: Bruce MacIntyre

    Full Description

    Timber Pile Removal and Replacement

    Kingston, WA

  • Former Kenai Facility

    Work Performed

    Furnish and place stone for shoreline rehabilitation. Included removal of existing sheet pile wall and backfill operations, providing and maintaining […]


    • Location: Kenai, AK
    • Dates: Apr-2012 - Sep-2012
    • Client: Chevron Environmental Management Company
    • Contact: Eugene Pak

    Full Description

    Former Chevron Kenai Facility

    Kenai, AK

  • Skagit River Bridge Dolphin

    Work Performed

    Remove existing structure and furnish and install 54-in diameter steel pipe pile utilizing bubble curtain system.


    • Location: Mount Vernon, WA
    • Contract: $205,000
    • Dates: Nov-2011 - Dec-2011
    • Client: WA Dept. of Transportation
    • Contact: Mark Hammer

    Full Description

    SR536 Skagit River Bridge Dolphin Replacement

    Mount Vernon, WA

  • Skagit River Bridge

    Work Performed

    Emergency repair of a portion of the Skagit River Bridge that collapsed near Mount Vernon after a semi-truck struck critical steel […]


    • Location: Mount Vernon, WA
    • Contract: $1,800,000
    • Dates: May-2013 - Aug-2013
    • Client: Guy F. Atkinson
    • Contact: Al Gonzales

    Full Description

    I-5 Skagit Bridge Collapse

    Mount Vernon, WA

  • Asarco Pier and Piling

    Work Performed

    Demolition and removal of more than 2,500 creosote-treated piling and three timber docks at Classified Superfund site. Load and transport […]


    • Location: Tacoma, WA
    • Contract: $2,300,000
    • Dates: Sep-2010 - Feb-2011
    • Client: Dept. of Natural Resources
    • Contact: Tim Goodman

    Full Description

    Asarco Pier & Piling Removal

    Tacoma, WA