News

Expanding Heavy Lift – Again

Cook Inlet, AK – In 2013, Pacific Pile & Marine expanded its heavy lift division in Cook Inlet, adding a 650-ton lifting capacity crane barge equipped with a 4600 Series 4 Crane to its fleet. In 2014, PPM began work to expand its heavy lift division even further. PPM was contracted to assist with the installation of a monopod […]

Read More

ENR Year in Projects

Juneau, AK – Built in the 1980s, the Don Statter Harbor in Alaska’s Auke Bay required a substantial upgrade to its moorage facility. The harbor serves the residents of the Mendenhall Valley and regional harbor patrons along with more than half a million commercial and recreational users who frequent the harbor each year. Owned by City Borough […]

Read More

DB Salvation

Seattle, WA – Pacific Pile & Marine expanded its heavy lift division in Cook Inlet, increasing its role in the oil & gas sector in Alaska when it added the D.B. Salvation, a 300 x 90 x 20 foot flat deck service barge equipped with a 4600 Series 4 Crane with 650-ton lifting capacity, to […]

Read More

ANB Harbor Replacement

Sitka, AK – In November, work began on Sitka’s ANB harbor to demolish all of the existing structures and replace them with new floats and pilings including more than 60 galvanized-steel pilings, ranging from 12 to 24 inches in diameter. In 2010, a pair of invasive tunicates – small marine invertebrates – was discovered in […]

Read More

Request Services